Refurbishment News

The hallway and bedroom are now finished after a slow but worthwhile process. However, the bedroom hasn’t yet had the ‘cage bed’ installed due to a few material shortages at the carpenters workshop. I am advising all people who require overnight dungeon hire access to wait patiently as the bed is constructed (at least three weeks).

The bathroom is my next project. This room is about to undergo a radical transformation, all existing utilities will be removed and replaced with a brand new toilet, sink, jacuzzi whirlpool bath and heated towel rail radiator. The walls are to be tiled from floor to ceiling, no more wallpaper! I’m not quite sure what to do with the bathroom floor but I’ve been given a few ideas.

The kitchen follows the above project. All units will be taken down and rehomed at a landfill site in Cannock. They will be replaced with new attractive models such as wall cupboards, work surfaces, integrated cooker with hood/extractor fan, dishwasher and new flooring.

An Englishman’s home is his castle 🏰